System selection

Find the right backup system.

Start with your real loads, then narrow the battery and inverter. Each step carries your result forward, so you never enter the same information twice.

Calculate my backup needs

One decision, three connected steps

The calculator determines the requirement. The two finders explain product fit and compatibility.

01Calculate

Backup calculator

Select the loads that must stay on and the expected outage duration.

Example output9.5 kWh · 3.2 kW
Example data
Run calculator
02Compare

Choose a battery

Match the calculated capacity to installation, stock and expansion needs.

RecommendedES-BOX34 PLUS
10.24 kWh
03Confirm

Choose a hybrid inverter

Confirm phase, peak demand, PV input and generator requirements.

Suggested class5.5 kW hybrid
Engineer confirmation required

How recommendations are made

A transparent pre-selection, not a black box.

The first two calculations come from electrical fundamentals. Product matching then uses current data sheets. Site design and local compliance require a qualified engineer or installer.

Why engineer confirmation remainsA battery can have enough kWh but still have insufficient discharge current for the inverter at full output. BMS communication, cable size, temperature and protective devices also affect the final system.
01

Energy requirement

Appliance power × operating time, adjusted for efficiency and reserve.

02

Peak power

Simultaneous running load plus the largest expected startup demand.

03

Battery fit

Required kWh, discharge current, installation, local stock and preferred 10.24 kWh path.

04

Inverter fit

Continuous power, phase, PV input, generator input and battery current capability.

Learn before you decide

Guides, definitions and direct answers.

Use these resources when you need the reasoning behind a specification or a practical answer before requesting a quote.

Selection FAQ

Questions before you rely on the result.

Short answers about inputs, current limits and when engineering review is required.

What should I prepare before using the selectors?

Start with the calculator result: required energy in kWh and peak demand in kW. Also confirm grid phase, planned PV power, installation location and whether local stock is the priority.

Is the recommended battery and inverter a final system design?

No. It is a preliminary product path. An engineer must confirm battery voltage, continuous charge and discharge current, BMS protocol, inverter data sheets, cables and protective devices before the quote.

Why can a battery have enough kWh but still be unsuitable?

kWh describes stored energy. The inverter also requires enough battery-side current at full output. If the battery's maximum continuous discharge current is too low, the selector sends the project for engineering review.

When does the automatic selection stop?

Manual review is triggered for requirements above the 17.41 kWh automatic home range, peak demand above 8 kW, three-phase supply, planned PV above 10 kW, incompatible battery current, rack installation or protected outdoor installation.

Does the selector prioritize stock in Ukraine?

When you choose “Ukraine stock first,” the selector first looks for an in-stock model that meets the capacity requirement. If none fits, it returns to the full home range. Without this priority, the 10.24 kWh path is favored when it fits.

Engineer-confirmed selection

Have a load list or calculator result?

Send the required kWh, peak kW, phase, planned PV and installation conditions. We will confirm the battery, inverter, BMS communication and system limits before the quote.

Send my result

Step 2 · Product fit

Choose a battery.

Use the capacity from the backup calculator, then confirm how and where the battery will be installed.

Required capacity9.5 kWh
Peak demand3.2 kW
Outage length6 h
SourceExample data

Refine the battery match

Capacity drives the first match. Installation choices help the engineer confirm the final model.

kWh

This finder narrows the product family. A Genixgreen engineer confirms BMS communication, cable sizing and installation conditions before the quote.

Best match

ES-BOX34 PLUS

Full-range model
Nominal capacity10.24 kWh
ChemistryLiFePO4
MountingWall / floor
Max. discharge150 A
  • Final compatibility is checked against the selected inverter.
View product range
Engineer-sized system

Step 3 · Compatibility

Choose a hybrid inverter.

Use the peak demand from the calculator and confirm phase, PV and generator requirements.

Selected batteryES-BOX34 PLUS
Battery capacity10.24 kWh
Peak demand3.2 kW
SourceCarried forward

Confirm compatibility inputs

Peak demand selects the power class. The remaining inputs determine whether standard matching is safe.

kW
kW

The result is a power class, not a wiring instruction. Communication protocol, charge current and local electrical requirements remain part of engineering confirmation.

Suggested class

5.5 kW hybrid inverter

Standard match
PhaseSingle-phase
PV input4.5 kW
Battery10.24 kWh
Load headroom2.3 kW
Review statusEngineer confirmation
  • The quote confirms battery communication and permitted charging current.

Готовы добавить Genixgreen в свой ассортимент?